WQ0003083000 Occidental Chemical Water Quality Permit Renewal |
Renews authorization for treated wastewater and stormwater discharges from an existing plant into Corpus Christi Bay and legally allows pollution to be discharged into our waterways
|
182466, PSDTX1694, PSD Permit GHGPSDTX265, GHGPSDTX123M2, 05710, PSDTX1306M2
|
Includes 2 modification requests, and 1 amendment. Increase in air emissions that will impact public health. There is a pending violation for exceeding air emissions already!
|
WQ0005473000 Project YaREN Water Discharge Permit |
Permit to discharge water used for cooling of industrial equipment into the bay. This will have increased salinity and pollutants which can cause harm to marine life.
|
WRPERM 14035 Project Yaren Water Rights Permit
|
Ingleside ammonia plant to obtain water from the bay that will be used to cool equipment. Damage to marine life (mesh not small enough). Permit is not complete.
|
4182 Chemours Federal Operating Permit Renewal |
Speak up now to protect our community’s health and environment by submitting a public comment on this permit, which contains significant gaps in monitoring, recordkeeping, and accountability that could allow harmful emissions to go unchecked.
|
SWG-2025-00662 Berry Island Permit
|
Expedited permit process to create 2 VLCC (very large crude-oil carrier) docks at 1200 ft in length each. 3.5 million cubic feet of sediment to be dredged and placed on Barry Island. Will increase boat traffic near IOB and be detrimental to sea life.
|
Need help with a comment? Click here for examples!
How to leave a comment:
- Go to the TCEQ comment website:
- https://www14.tceq.texas.gov/epic/eComment/
- Enter the permit number. You will need to do a separate request for each permit.
- Enter your demographic information and comments. You can upload a Word document instead of typing out your comments.
- Click “Submit.”